Migration Plan: Core Network – Switch Upgrade 2016

Brownout Schedule:

 21st Oct Friday 7pm – 24th Oct Monday 6pm

planned-outage

 

Building Locations

network-update-diagram

 

 

Testing needed:

  1. Friday Night Testing
    • VPN connectivity
    • Lync
    • Email
    • Test to access servers
    • Citrix
    • Access to sites
    • All normal remote activities
    • Library
    • Hosted websites
    • NB Block testing will be done
  1. Buildings Based Testing
  • LAN Connectivity Test
    • Basic physical connectivity test to see if correct IPs are received and can see gateway and get authentication, access to internet etc
    • Test server access – drives
    • Test web based applications
    • Test SFB
    • Test physical phones

 

  • Wireless Connectivity Test
    • Test for SSIDs- MIT Wireless, guest
    • Basic physical connectivity test to see if correct IPs are received and can see gateway and get authentication, access to internet etc
    • Test server access – drives
    • Test web based applications
    • Test Citrix
    • Test SFB
    • Test physical phones